  1. Glossary01

    Transmittal

    The formal, recorded issue of controlled drawings or documents to another party, with a cover sheet listing every file and its revision.

    Read the definition
  2. Glossary02

    Drawing register

    The master index of every drawing on a project or asset, recording each drawing number, title, and current revision in one controlled list.

    Read the definition
  3. Glossary03

    Revision control

    The discipline of tracking each iteration of a drawing so everyone works from the current version and superseded versions stay on the record.

    Read the definition
  4. Glossary04

    As-constructed drawings

    Drawings updated to reflect what was actually built or installed, handed over as the record set at project completion.

    Read the definition
  5. Glossary05

    Title block

    The framed panel on a drawing sheet that holds its identifying metadata, including the drawing number, title, scale, and current revision.

    Read the definition
  6. Glossary06

    Submittal package

    A batch of drawings or documents delivered together for review or handover, checked against the drafting standard before it is accepted.

    Read the definition
  7. Glossary07

    Asset hierarchy

    The structured breakdown of a physical asset into systems and components, used to tag and retrieve the documents that belong to each part.

    Read the definition
  8. Glossary08

    Redline markup

    An annotation layered over a drawing to flag an error or request a change, triggering a revision without altering the released file.

    Read the definition
  9. Glossary09

    ISO 19650

    The international standard series for managing information about buildings and civil engineering works across the whole life of an asset, from design and construction through to operation.

    Read the definition
  10. Glossary10

    Issued for construction (IFC)

    The drawing status that records a drawing as reviewed, approved, and released for the works to be built from.

    Read the definition
  11. Glossary11

    Document numbering

    The agreed convention that gives every drawing and document a unique, structured identifier, so the number itself records what the document is and where it belongs.

    Read the definition
  12. Glossary12

    Superseded drawings

    Revisions replaced by newer ones, retired from use but kept on the record and marked so nobody mistakes one for the current sheet.

    Read the definition
  13. Glossary13

    Controlled document

    A document whose changes run through a defined process, with a named owner, review and approval before release, tracked distribution, and a full revision history.

    Read the definition
  14. Glossary14

    Operation and maintenance manual

    The compiled record of how a completed asset and its installed equipment are operated, serviced, and repaired, handed to the owner at practical completion.

    Read the definition
  15. Glossary15

    Native file

    A drawing or model held in the format its authoring application wrote, such as DWG, DGN, or RVT, carrying the editable geometry a PDF plot only pictures.

    Read the definition
  16. Glossary16

    Request for information (RFI)

    A formal question raised during construction to resolve a gap, conflict, or ambiguity in the contract documents, logged and answered on the record.

    Read the definition
  17. Glossary17

    Issued for review (IFR)

    The drawing status that releases a document to reviewers for comment before it has been approved, carrying no authority to build.

    Read the definition
  18. Glossary18

    Uncontrolled when printed

    The note stamped on a drawing warning that a printed or downloaded copy has left the document control system, so nothing guarantees it is still the current revision.

    Read the definition
  19. Glossary19

    Master document register (MDR)

    The controlled list of every document a project or asset must produce and hold, recording each document's number, title, revision, status, and responsible party.

    Read the definition
  20. Glossary20

    Engineering document management system (EDMS)

    The controlled system an engineering organisation keeps its drawings, models, and technical documents in, holding each one as a numbered, revisioned record rather than a file in a folder.

    Read the definition
fig. 03 · get started

See the record these terms describe.

Book a walkthrough with someone who knows what a transmittal and an as-constructed drawing are, and watch Lunr keep every drawing on the record.

10M+ documents under management · Hosted in Australia and the US · SAML · Full audit trail · Export anytime

entity
Lunr Labs Pty Ltd
location
Melbourne AU
workspace
documents.lunr.app
rev
2026